Mark your calendar for our FINAL Public Input Meeting for the Gardner Street Corridor Study. It is imperative that we lay the foundation of engineering options for the future!
A traffic study of the Illinois Route 75 (Gardner Street) corridor is being conducted by the Stateline Area Transportation Study (SLATS MPO) and the City of South Beloit. This study, which extends from Illinois Route 2 (Blackhawk Boulevard) to the Illinois-Wisconsin state line, will evaluate traffic operations, traffic safety, access, and multimodal accommodations along the roadway and recommend solutions that will address current and anticipated corridor deficiencies. While this project will evaluate existing features such as roadway and intersection geometrics, there is no construction project associated with this study, or its recommendations, at this time.